CSE - Practice Test -06 | MyPerfectise Solutions

CoderIndeed
0
1) Which of the following is not an important condition for preventive maintenance?
Ans: none of them 

2) The term Operations Research was coined in the year
Ans: 1978

3) What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project?
Ans: Task set
4) "Budgeting, analysis of investment proposals, and provision of funds are activities associated
with the _______ function."
Ans: finance

5) Which of the following does not belongs to project planning technique? 
Ans:IRR (internal rate of return)

6) Operations Research has the characteristics the it is done by a team o
Ans: Scientists

7) "The time between its earliest and latest start time, or between its earliest and latest finish time of an activity is "
Ans: slack time

8) Process layout is used for
Ans: repitative processing 

9) The problem is a special type of linear programming problem where the objective is to minimise the cost of distributing a product from a number of sources or origins to a number of destinations
Ans: transportation problem 

10) Transportation problem is a special type of Linear problem 
Ans: True

11) What involves preparing software for external release and keeping track of the system versions that have been released for customer use?
Ans: Release management

12) "Which of the following is true for Inventory control?
Ans: All of them 

13) Operations Research (OR) , which is a very powerful tool for
 
Ans: Decision – Making

14) Manufacturing work sent to other countries is called:
Ans: Outsourcing

15) As a software manager, when you will decide the number of people required for a software project?
Ans: After an estimate of the development effort is made.

16) ______ is the incidental residue from certain types of manufacture usually of low value recoverable without further processing.
Ans: Wastage

17) What aims at optimizing inventory levels?
Ans: Inventory Planning

18) In north west method, rule of allocation is done 
Ans: Upper left corner

19) Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks?
Ans: Software project scheduling

20) Which of the following is a project scheduling method that can be applied to software development?
Ans: Both PERT and CPM

21) Operations Research cannot give perfect ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ to problems
Ans: Both A and B

22) The solution of transhipment  problem is said to be optimal if it
Ans: Minimize the cost

23) "_______ is the result of various causes such as substandard materials, bad supervision, and carelessness in planning etc."
Ans: Defective work

24) "Which of the following is a production planning technique? "
Ans: Loading

25) The objective of the transportation problem which is to be maximized is to
Ans: All of them 
(getCard) #type=(custom) #title=(CSE PlaceMe Answer Key) #info=(All Levels) #button=(View) #icon=(folder_open)

Post a Comment

0Comments

Post a Comment (0)

#buttons=(Accept !) #days=(20)

Our website uses cookies to enhance your experience. Check Now
Accept !